SRF Reports - 1996
- SRF 961217-04
- Beam Installation of the BB1-2 Cavity: Waveguide Adjustment and Cavity Positioning
S. Belomestnykh, R. Kaplan and J. Kirchgessner
Postscript
- PDF
- SRF 960529-02
- Superconducting RF System for the CESR Luminosity Upgrade: Design, Status, and Plans
S. Belomestnykh et al.
Postscript
- PDF
- SRF 960202-01
- Calculations of the Loss Factor of the BB1 Superconducting Cavity Assemblies
S. Belomestnykh and W. Hartung
Postscript (1.3 MB)
preprint@mail.lns.cornell.edu